10.11440061487_si_015.mov (14.99 MB)
Download fileMovie 17: Drilled vs. planned well trajectories
media
posted on 2020-01-10, 15:00 authored by C. Dart, J.M. Denichou, T. Bridger, R. Haugen, S. Søjholm, Å. Halvorsen, V. Øye, M. Seim1–12 s: seismic pass pans towards the viewer and southeastwards along the drilling direction of BY3H. The drilled well lies to the left of the planned well in the view.