Movie 17: Drilled vs. planned well trajectories
C. Dart
J.M. Denichou
T. Bridger
R. Haugen
S. Søjholm
Å. Halvorsen
V. Øye
M. Seim
10.6084/m9.figshare.11568885.v1
https://geolsoc.figshare.com/articles/media/Movie_17_Drilled_vs_planned_well_trajectories/11568885
1–12 s: seismic pass pans towards the viewer and southeastwards along the drilling direction of BY3H. The drilled well lies to the left of the planned well in the view.
2020-01-10 15:00:59
BY 3H
southeastward
viewer
movie
trajectorie
drilling direction
vs
Drilled
Geology